150cc or 200cc cargo trike: what the extra displacement actually buys
In our catalogue 150cc and 200cc cargo trikes overlap almost completely on payload — 500–2,000 kg versus 500–1,200 kg. What the extra…
MOQ 1 applies per unit, mixed containers are allowed, and five things get fixed in writing before production. A practical sequence for a distributor's first order.
A first order is not a smaller version of a container order. It is the order where the buyer and the factory agree what the machine is, and most of the cost of getting that wrong appears months later, at the port or in the workshop. This is how we put one together.
Every model in this catalogue lists a minimum of one unit. That is deliberate: a distributor testing a market should be able to buy a single machine, run it, and then commit. The minimum applies per unit, not per model, so a first order can mix several models in one container.
What a mixed container does change is the packing plan. Each model has its own crate dimensions and its own loading position, and the loading plan is calculated for the exact mix you order — that figure is what your forwarder needs for a real freight quote.
Three reasons, in the order they tend to matter:
Once the quotation is accepted, these are agreed in writing and do not change after the batch starts:
If any of those is left to “the usual”, the batch will be built to the factory’s usual — which is not necessarily what you quoted to your customer.
The documents that ship with the order are the ones that clear the port and the ones your customer’s registration office will ask for:
Approval in your own market stays with you as the importer. We provide the file we hold; we do not promise that a third country’s authority will accept it.
Three things are worth saying plainly, because they are where first orders go wrong:
Yes. The minimum is per unit, and a mixed container is allowed. The loading plan is calculated for the mix.
It is not required, but wear parts ship with the machines and it is the cheapest moment to include them — the freight is already paid to your port.
Tell us the timeline. Slots are allocated against confirmed orders, so we can tell you honestly what is available rather than hold a date that will move.
Practical notes on specifying, importing and loading three-wheel motorcycles.
In our catalogue 150cc and 200cc cargo trikes overlap almost completely on payload — 500–2,000 kg versus 500–1,200 kg. What the extra…
Customs problems rarely come from the vehicle. They come from paperwork that assumed something the destination market does not accept. This checklist…
The number of three-wheel motorcycles that fit in a container is not a fixed figure that comes with the model. It is…
Send the duty cycle, the quantity and the destination port. You get a specification check and a quotation, and the figures the factory cannot confirm are marked as such rather than estimated.